Euro-training Center
 Risk Based Strategies For Inspection amp Maintenance 19 May Sharm El Sheikh Egypt QR Code
Inquiry PDF (10) Like Share   Print

Maintenance and Engineering

Risk Based Strategies For Inspection & Maintenance


REF : O1018 DATES: 19 - 23 May 2024 VENUE: Sharm El-Sheikh (Egypt)-Sheraton Sharm Hotel, Resort, FEE : 4465 

Overview:

Introduction:

Risk-Based Inspection (RBI) methodology enables the assessment of the likelihood and potential consequences of pressure equipment failures. RBI provides companies the opportunity to prioritize their equipment for inspection; optimize inspection methods, frequencies, and resources; develop specific equipment inspection plans; and enable the implementation of Reliability Centered Maintenance. This results in improved safety, lower failure risks, fewer forced shutdowns, and reduced operational costs.

Course Objectives:

At the end of this course the participants will be able to:

  • Show how to develop a successful RBI program at your facility
  • Gain practical and effective methods they need to perform practical likelihood and consequence analysis
  • Develop optimum Inspection intervals for individual equipment based on the assessment of the active degradation mechanisms
  • Provide a clear understanding of the key aspects of Risk-Based Inspection, its advantages, and limitations
  • Provide a clear understanding of how it is linked to reliability-centered maintenance
  • Understand how fitness-for-service assessment affects the Risk

Targeted Audience:

  • Operations Engineers
  • Maintenance Engineers
  • Engineering Managers and Supervisors
  • Technical Staff with responsibilities for inspection, maintenance, assessment and mitigation of plant equipment degradation, and who want to use RBI effectively in their plants

Course Outlines:

Unit 1: Risk-Based Inspection (RBI)

  • Definitions
  • Evolution
  • Key Elements of RBI
  • Reasons for implementing RBI
  • Benefits and Limitations of using RBI
  • RBI as a part of plant integrity management
  • Economic Benefits
  • API Risk-Based Inspection Methodology
  • API RP 580
  • API BRD 581 – Various levels of RBI Analyses
  • Impact of RBI on Related API Codes, Standards, and Recommended Practices
  • API 510, 570 and 650
  • API 579 Fitness-For-Purpose
  • API Risk-Based Inspection Software

Unit 2: Inspection Interval Optimization Based on Assessed Risk:

  • Evaluation of Inspection Results
  • Data Quality
  • Corrosion Rate Calculations
  • Remaining Life Calculations
  • Fitness-For-Service Assessments
  • Estimation of the Consequences of Failures

Unit 3: Overview of API 571 - Recognition of Conditions Causing Deterioration of Failure:

  • Overview of over 60 damage mechanisms found in refineries
  • A detailed discussion of some common damage mechanisms: Internal and external corrosion, brittle fracture, fatigue, SCC, HIC, internal and external corrosion
  • Identification of Deterioration Mechanisms & Failure Modes
  • Active damage mechanisms in critical plant equipment
  • Inactive or “unlikely” mechanisms
  • Identification for assessment
  • Impact of simultaneous mechanisms
  • Selection of Suitable Materials for Specific Deterioration Mechanisms
  • Integrated Asset Management
  • Linking Risk Assessment, RBI, and RCM
  • Managing Risk Using RBI

Unit 4: Significance of Inspection in Plant Integrity and Maintenance Costs:

  • The Real Function of Inspection
  • Inspection Key Performance Indicators
  • Common Inspection Strategies and Their Limitations
  • Risk-Based Decision-Making Fundamentals and Tools
  • Risk Assessment - Probability of failure, consequences of failure
  • Risk Management – Avoidance, Mitigation
  • Risk Communication
  • Understanding and Managing Risk
  • Principles of Risk Assessment
  • Risk Assessment Elements
  • Qualitative, Semi-quantitative, and Quantitative Assessment

Unit 5: Development of Inspection Plan (Based on RBI Risk Ranking):

  • Inspection Planning Guidance
  • Need for Some Speculative / Exploratory Inspection
  • RBI Implementation
  • Essentials for Establishing a Successful RBI Program
  • The RBI Team - Recommended Structure and Mandate
  • Developing Equipment and Piping Systems / Circuits Inventory
  • Inspection History, Interpretation
  • Equipment Criticality Rating
  • Equipment DataBase
  • Shared Database by RBI and RCM
  • Importance of Data Quality
  • Computerized Maintenance Management Systems